A study of data center electricity asks whether an apparently cheap power supply still looks cheap if it delays when a computing facility can start. The authors model four designs in the continental United States and assign a value to the computing work a facility could have done during the wait.
How the authors compare power options
The study evaluates grid interconnection, on-site natural gas and two solar-plus-storage designs, one coupled through alternating current and one using direct current. It models comparable energy service across the designs and accounts for cooling demand, power conversion and battery degradation. The authors use calibrated computing loads rather than treating the building as a constant electricity draw in every circumstance.
What changes when timing counts
The authors report that the direct-current design cut lifetime energy costs by 18% on average relative to the alternating-current equivalent in their model. Even so, the direct-current microgrids were rarely the lowest-cost option on the authors’ energy-only measure.
Adding the value of earlier computing changed the ranking. Under the main assumptions, the direct-current microgrid had the lowest modeled cost in 85% of the locations considered. The share fell to 55% under a scenario with faster natural gas deployment. Those are scenario results rather than observations of operating projects.
The assumptions worth checking
The result depends in part on when each system can realistically deliver power and on how much the operator values the computing capacity it gains by opening earlier. A site comparing options can ask for both estimates: the cost of the electricity delivered and the cost of waiting for it. That distinction is useful even at a site where the authors’ preferred design would rank differently.